-->
Natural Natural

Solar Roof Top Yojana Gujarat

Post a Comment

 

Solar Roof Top Yojana Gujarat

Solar Energy Roof Top Plan By Gujarat Government

Important Link

ગજબનો ચોર ઘર માં ચોરી કરવા ગયો અને ત્યાંજ સૂઈ ગયો વિડિયો જોવા - CLICK HERE

Watch Video about Solar Roof Top : Click Here

For Full Information about Solar Roof Top : Click Here

માન્ય એજન્સી લિસ્ટ : અહીં ક્લિક કરો.

For uniform and successful implementation of 'Surya-Gujarat' scheme in the entire state, it was directed to take action as per the above mentioned circular for all the four power distribution companies owned by the state government and private licensed power distribution companies.

Was. For the implementation of this scheme in the year 2020-21, new rates for installation of solar rooftop have been exploited by PGVCL through Expression of interest and for the year 2020-21, successful AGOs have been re-accredited, a new body of recognized agencies. Prepared by PGVCL.


Therefore, the following conditions are amended for the implementation of this scheme in the year 2020-21 in the above mentioned circular dated 08/06/2018.

For the year 2020-21, after the process of Expression of Interest (EOI) issued by GUVNL through PGVCL, the fixed rate (inclusive of all taxes) of Rs. The following state government subsidy or CFA from the central government will be eligible for the total cost.


A) Solar rooftop systems installed and operated by private residential electricity customers will be eligible for the following subsidy:

C) The following residential electricity consumers who have installed and commissioned a solar rooftop system during the previous scheme and wish to increase the capacity of the existing solar system in their homes will also be eligible for subsidy subject to the following conditions, provided that,


i. The capacity of the previously implemented solar system is 10 kW. Less than, ii. Only 20% subsidy will be available on the increased solar capacity if the total capacity of the solar system with the increase of the capacity of the previously implemented solar system is up to 5 kV and if the total capacity of the solar system with the increase is more than 2 kV and 10 kV or less then only increased solar capacity. But 50% subsidy will be available. Subsidy will not be available on total solar system capacity of more than 10 kW.


The subsidy will be paid according to the DC capacity of the solar panel and the AC capacity of the inverter whichever is less. A sample sheet showing the calculation of subsidy is given in Appendix-Ch (2020-21).


. No bet. 13: - For the implementation of this scheme, the power distribution companies will have to take the following steps to get the CFA and state subsidy of MNRE.


(a) For the Solar Capacity (MW) allotted to each Distribution Company of Gujarat by the New and Renewable Ministry (MNRE) of the Government of India as per MNRE Sanction, the Distribution Company must take necessary action to obtain CFA from MNRE. (b) If the capacity in addition to the solar capacity allotted by MNRE is implemented, the State

Allotted in the Budget for the Fiscal Year 2020-21 of the Climate Change Department of the Government


The grant will be used to cover the subsidy for which the required funds are received by GUVNL from EPD,


Allocation will be made to global distribution companies as per rules.

Related Posts

There is no other posts in this category.

Post a Comment

Subscribe Our Newsletter